How are plumbing fixture requirements calculated for a project?
The first step is to determine occupancy load of the space using Table 1004.1.2 in the NC Building code. Once this is established review Section 403 of the NC Plumbing Code along with table 403.1 to determine your minimum fixture count. For more information call the Planning and Development office at 910-455-3661.

Show All Answers

1. How are plumbing fixture requirements calculated for a project?
2. Do I need a permit to install low voltage wiring (phone & data, fire alarm, HVAC control wiring, etc.) in Onslow County?
3. How do I call in for an inspection on my project?
4. Do I need a permit to build an ADA Accessible Ramp?
5. What will my permit cost?
6. How do I change the general contractor (GC) on my permit?
7. What are the requirements for a new business locating in an existing building?
8. I want to build an addition to my house. Can I do my own electrical work?
9. What time is the inspector coming to do my inspection today?
10. What does "per North Carolina Building codes" mean?
11. Do I need a building permit when building a new deck or deck extension (adding to) when it is attached or detached to my house?